1. A worker completes a job in 29 days. What fraction is completed in one day?
A 2/29 B 9/29 C 1/20 D 1/29
Answer: D) 1/29
2. A worker completes a job in 20 days. What fraction is completed in one day?
A 2/5 B 1/20 C 1/10 D 1/12
Answer: B) 1/20
3. A worker completes a job in 21 days. What fraction is completed in one day?
A 2/21 B 1/21 C 6/7 D 1/3
Answer: B) 1/21
4. A worker completes a job in 15 days. What fraction is completed in one day?
A 1/15 B 2/15 C 1/13 D 0
Answer: A) 1/15
5. A worker completes a job in 24 days. What fraction is completed in one day?
A 1/12 B 1/24 C 5/24 D 1/19
Answer: B) 1/24
6. A worker completes a job in 35 days. What fraction is completed in one day?
A 1/17 B 2/35 C 18/35 D 1/35
Answer: D) 1/35
7. A worker completes a job in 19 days. What fraction is completed in one day?
A 2/19 B 1/2 C 17/19 D 1/19
Answer: D) 1/19
8. A worker completes a job in 26 days. What fraction is completed in one day?
A 6/13 B 1/13 C 1/26 D 1/14
Answer: C) 1/26
9. A worker completes a job in 34 days. What fraction is completed in one day?
A 1/17 B 1/21 C 1/34 D 13/34
Answer: C) 1/34
10. A worker completes a job in 27 days. What fraction is completed in one day?
A 2/27 B 1/9 C 2/3 D 1/27
Answer: D) 1/27
11. A worker completes a job in 31 days. What fraction is completed in one day?
A 17/31 B 2/31 C 1/14 D 1/31
Answer: D) 1/31
12. A worker completes a job in 12 days. What fraction is completed in one day?
A 1/12 B 1/6 C 7/12 D 1/5
Answer: A) 1/12
13. A worker completes a job in 25 days. What fraction is completed in one day?
A 1/15 B 1/25 C 2/25 D 2/5
Answer: B) 1/25
14. A worker completes a job in 6 days. What fraction is completed in one day?
A 1/2 B 1/6 C 1/3 D 0
Answer: B) 1/6
15. A worker completes a job in 22 days. What fraction is completed in one day?
A 1/15 B 7/22 C 1/11 D 1/22
Answer: D) 1/22
16. A worker completes a job in 30 days. What fraction is completed in one day?
A 1/30 B 1/5 C 1/24 D 1/15
Answer: A) 1/30
17. A worker completes a job in 14 days. What fraction is completed in one day?
A 1/14 B 3/7 C 1/7 D 1/8
Answer: A) 1/14
18. A worker completes a job in 18 days. What fraction is completed in one day?
A 4/9 B 1/9 C 1/18 D 1/10
Answer: C) 1/18
19. A worker completes a job in 33 days. What fraction is completed in one day?
A 1/22 B 2/33 C 1/33 D 1/3
Answer: C) 1/33
20. A worker completes a job in 40 days. What fraction is completed in one day?
A 19/40 B 1/21 C 1/20 D 1/40
Answer: D) 1/40
21. A worker needs 34 days for a job. What fraction is completed in 3 days?
A 3/34 B 15/34 C 2/17 D 19/34
Answer: A) 3/34
22. A worker needs 33 days for a job. What fraction is completed in 17 days?
A 17/33 B 1/3 C 2/3 D 6/11
Answer: A) 17/33
23. A worker needs 19 days for a job. What fraction is completed in 5 days?
A 6/19 B 9/19 C 10/19 D 5/19
Answer: D) 5/19
24. A worker needs 11 days for a job. What fraction is completed in 2 days?
A 2/11 B 3/11 C 1/11 D 9/11
Answer: A) 2/11
25. A worker needs 36 days for a job. What fraction is completed in 14 days?
A 23/36 B 7/18 C 4/9 D 13/36
Answer: B) 7/18
26. A worker needs 21 days for a job. What fraction is completed in 10 days?
A 10/21 B 13/21 C 8/21 D 11/21
Answer: A) 10/21
27. A worker needs 38 days for a job. What fraction is completed in 14 days?
A 17/19 B 2/19 C 8/19 D 7/19
Answer: D) 7/19
28. A worker needs 29 days for a job. What fraction is completed in 5 days?
A 6/29 B 5/29 C 14/29 D 15/29
Answer: B) 5/29
29. A worker needs 39 days for a job. What fraction is completed in 16 days?
A 16/39 B 7/39 C 32/39 D 17/39
Answer: A) 16/39
30. A worker needs 26 days for a job. What fraction is completed in 11 days?
A 9/26 B 6/13 C 11/26 D 17/26
Answer: C) 11/26
31. A worker needs 28 days for a job. What fraction is completed in 2 days?
A 5/14 B 1/7 C 1/14 D 9/14
Answer: C) 1/14
32. A worker needs 19 days for a job. What fraction is completed in 9 days?
A 10/19 B 2/19 C 9/19 D 17/19
Answer: C) 9/19
33. A worker needs 32 days for a job. What fraction is completed in 18 days?
A 3/16 B 9/16 C 13/16 D 5/8
Answer: B) 9/16
34. A worker needs 29 days for a job. What fraction is completed in 3 days?
A 3/29 B 4/29 C 16/29 D 13/29
Answer: A) 3/29
35. A worker needs 17 days for a job. What fraction is completed in 8 days?
A 9/17 B 8/17 C 10/17 D 7/17
Answer: B) 8/17
36. A worker needs 45 days for a job. What fraction is completed in 12 days?
A 1/5 B 1/3 C 4/15 D 2/3
Answer: C) 4/15
37. A worker needs 32 days for a job. What fraction is completed in 7 days?
A 27/32 B 5/32 C 7/32 D 1/4
Answer: C) 7/32
38. A worker needs 22 days for a job. What fraction is completed in 12 days?
A 8/11 B 6/11 C 3/11 D 7/11
Answer: B) 6/11
39. A worker needs 28 days for a job. What fraction is completed in 10 days?
A 3/7 B 15/28 C 5/14 D 13/28
Answer: C) 5/14
40. A worker needs 33 days for a job. What fraction is completed in 8 days?
A 2/3 B 8/33 C 3/11 D 1/3
Answer: B) 8/33
41. A job takes 23 days. What fraction remains after 8 days?
A 16/23 B 15/23 C 8/23 D 4/23
Answer: B) 15/23
42. A job takes 37 days. What fraction remains after 15 days?
A 15/37 B 14/37 C 22/37 D 23/37
Answer: C) 22/37
43. A job takes 15 days. What fraction remains after 4 days?
A 1/5 B 4/5 C 4/15 D 11/15
Answer: D) 11/15
44. A job takes 36 days. What fraction remains after 20 days?
A 5/9 B 1/3 C 4/9 D 7/18
Answer: C) 4/9
45. A job takes 29 days. What fraction remains after 18 days?
A 12/29 B 18/29 C 6/29 D 11/29
Answer: D) 11/29
46. A job takes 22 days. What fraction remains after 4 days?
A 4/11 B 2/11 C 9/11 D 10/11
Answer: C) 9/11
47. A job takes 25 days. What fraction remains after 12 days?
A 14/25 B 12/25 C 1/5 D 13/25
Answer: D) 13/25
48. A job takes 40 days. What fraction remains after 10 days?
A 1/4 B 1 C 3/8 D 3/4
Answer: D) 3/4
49. A job takes 29 days. What fraction remains after 5 days?
A 25/29 B 5/29 C 9/29 D 24/29
Answer: D) 24/29
50. A job takes 40 days. What fraction remains after 22 days?
A 11/40 B 11/20 C 1/2 D 9/20
Answer: D) 9/20
51. A job takes 9 days. What fraction remains after 2 days?
A 2/9 B 8/9 C 2/3 D 7/9
Answer: D) 7/9
52. A job takes 42 days. What fraction remains after 20 days?
A 10/21 B 11/21 C 4/7 D 3/7
Answer: B) 11/21
53. A job takes 26 days. What fraction remains after 7 days?
A 7/26 B 19/26 C 10/13 D 6/13
Answer: B) 19/26
54. A job takes 43 days. What fraction remains after 21 days?
A 21/43 B 12/43 C 22/43 D 23/43
Answer: C) 22/43
55. A job takes 46 days. What fraction remains after 13 days?
A 13/46 B 33/46 C 9/23 D 17/23
Answer: B) 33/46
56. A job takes 34 days. What fraction remains after 17 days?
A 1/2 B 1 C 0 D 5/17
Answer: A) 1/2
57. A job takes 30 days. What fraction remains after 4 days?
A 13/15 B 2/15 C 19/30 D 14/15
Answer: A) 13/15
58. A job takes 27 days. What fraction remains after 7 days?
A 7/9 B 7/27 C 20/27 D 4/9
Answer: C) 20/27
59. A job takes 29 days. What fraction remains after 15 days?
A 5/29 B 13/29 C 14/29 D 15/29
Answer: C) 14/29
60. A job takes 21 days. What fraction remains after 4 days?
A 6/7 B 5/7 C 17/21 D 4/21
Answer: C) 17/21
61. A completes a job in 9 days and B in 9 days. How many days together?
A 18 B 9 C 5 D 9/2
Answer: D) 9/2
62. A completes a job in 29 days and B in 25 days. How many days together?
A 29 B 25 C 725/54 D 54
Answer: C) 725/54
63. A completes a job in 15 days and B in 10 days. How many days together?
A 25 B 10 C 6 D 15
Answer: C) 6
64. A completes a job in 31 days and B in 18 days. How many days together?
A 31 B 18 C 558/49 D 49
Answer: C) 558/49
65. A completes a job in 24 days and B in 13 days. How many days together?
A 24 B 13 C 37 D 312/37
Answer: D) 312/37
66. A completes a job in 15 days and B in 8 days. How many days together?
A 120/23 B 23 C 15 D 8
Answer: A) 120/23
67. A completes a job in 26 days and B in 11 days. How many days together?
A 26 B 286/37 C 37 D 11
Answer: B) 286/37
68. A completes a job in 25 days and B in 10 days. How many days together?
A 35 B 50/7 C 10 D 25
Answer: B) 50/7
69. A completes a job in 35 days and B in 28 days. How many days together?
A 28 B 140/9 C 63 D 35
Answer: B) 140/9
70. A completes a job in 27 days and B in 10 days. How many days together?
A 37 B 270/37 C 10 D 27
Answer: B) 270/37
71. A completes a job in 23 days and B in 25 days. How many days together?
A 48 B 575/48 C 25 D 23
Answer: B) 575/48
72. A completes a job in 36 days and B in 20 days. How many days together?
A 36 B 20 C 56 D 90/7
Answer: D) 90/7
73. A completes a job in 18 days and B in 23 days. How many days together?
A 23 B 18 C 414/41 D 41
Answer: C) 414/41
74. A completes a job in 9 days and B in 12 days. How many days together?
A 9 B 12 C 21 D 36/7
Answer: D) 36/7
75. A completes a job in 24 days and B in 14 days. How many days together?
A 24 B 168/19 C 14 D 38
Answer: B) 168/19
76. A completes a job in 24 days and B in 29 days. How many days together?
A 53 B 24 C 696/53 D 29
Answer: C) 696/53
77. A completes a job in 34 days and B in 12 days. How many days together?
A 204/23 B 34 C 46 D 12
Answer: A) 204/23
78. A completes a job in 9 days and B in 15 days. How many days together?
A 15 B 24 C 9 D 45/8
Answer: D) 45/8
79. A completes a job in 25 days and B in 29 days. How many days together?
A 29 B 725/54 C 25 D 54
Answer: B) 725/54
80. A completes a job in 35 days and B in 25 days. How many days together?
A 25 B 35 C 60 D 175/12
Answer: D) 175/12
81. Two workers together take 10 days. One alone takes 28 days. How many days does the other take alone?
A 18 B 140/9 C 28 D 10
Answer: B) 140/9
82. Two workers together take 8 days. One alone takes 34 days. How many days does the other take alone?
A 8 B 34 C 26 D 136/13
Answer: D) 136/13
83. Two workers together take 16 days. One alone takes 47 days. How many days does the other take alone?
A 31 B 47 C 16 D 752/31
Answer: D) 752/31
84. Two workers together take 7 days. One alone takes 32 days. How many days does the other take alone?
A 25 B 7 C 32 D 224/25
Answer: D) 224/25
85. Two workers together take 23 days. One alone takes 56 days. How many days does the other take alone?
A 56 B 23 C 33 D 1288/33
Answer: D) 1288/33
86. Two workers together take 14 days. One alone takes 45 days. How many days does the other take alone?
A 630/31 B 14 C 31 D 45
Answer: A) 630/31
87. Two workers together take 14 days. One alone takes 44 days. How many days does the other take alone?
A 44 B 14 C 308/15 D 30
Answer: C) 308/15
88. Two workers together take 12 days. One alone takes 33 days. How many days does the other take alone?
A 12 B 33 C 132/7 D 21
Answer: C) 132/7
89. Two workers together take 9 days. One alone takes 28 days. How many days does the other take alone?
A 19 B 9 C 252/19 D 28
Answer: C) 252/19
90. Two workers together take 12 days. One alone takes 40 days. How many days does the other take alone?
A 12 B 28 C 40 D 120/7
Answer: D) 120/7
91. Two workers together take 9 days. One alone takes 22 days. How many days does the other take alone?
A 9 B 13 C 22 D 198/13
Answer: D) 198/13
92. Two workers together take 14 days. One alone takes 31 days. How many days does the other take alone?
A 14 B 31 C 17 D 434/17
Answer: D) 434/17
93. Two workers together take 18 days. One alone takes 50 days. How many days does the other take alone?
A 18 B 32 C 225/8 D 50
Answer: C) 225/8
94. Two workers together take 2 days. One alone takes 15 days. How many days does the other take alone?
A 13 B 15 C 30/13 D 2
Answer: C) 30/13
95. Two workers together take 4 days. One alone takes 24 days. How many days does the other take alone?
A 24/5 B 20 C 24 D 4
Answer: A) 24/5
96. Two workers together take 4 days. One alone takes 14 days. How many days does the other take alone?
A 28/5 B 4 C 10 D 14
Answer: A) 28/5
97. Two workers together take 14 days. One alone takes 32 days. How many days does the other take alone?
A 14 B 224/9 C 18 D 32
Answer: B) 224/9
98. Two workers together take 13 days. One alone takes 34 days. How many days does the other take alone?
A 13 B 21 C 442/21 D 34
Answer: C) 442/21
99. Two workers together take 10 days. One alone takes 34 days. How many days does the other take alone?
A 24 B 10 C 85/6 D 34
Answer: C) 85/6
100. Two workers together take 24 days. One alone takes 61 days. How many days does the other take alone?
A 61 B 1464/37 C 37 D 24
Answer: B) 1464/37
101. 16 workers finish a job in 24 days. How many days for 64 equally efficient workers?
A 7 B 4 C 24 D 6
Answer: D) 6
102. 17 workers finish a job in 216 days. How many days for 306 equally efficient workers?
A 13 B 12 C 18 D 216
Answer: B) 12
103. 10 workers finish a job in 36 days. How many days for 90 equally efficient workers?
A 9 B 36 C 5 D 4
Answer: D) 4
104. 5 workers finish a job in 165 days. How many days for 75 equally efficient workers?
A 11 B 12 C 165 D 15
Answer: A) 11
105. 20 workers finish a job in 54 days. How many days for 180 equally efficient workers?
A 9 B 54 C 6 D 7
Answer: C) 6
106. 16 workers finish a job in 90 days. How many days for 240 equally efficient workers?
A 90 B 7 C 6 D 15
Answer: C) 6
107. 19 workers finish a job in 9 days. How many days for 57 equally efficient workers?
A 2 B 4 C 9 D 3
Answer: D) 3
108. 15 workers finish a job in 24 days. How many days for 45 equally efficient workers?
A 9 B 3 C 24 D 8
Answer: D) 8
109. 24 workers finish a job in 48 days. How many days for 192 equally efficient workers?
A 6 B 48 C 7 D 8
Answer: A) 6
110. 10 workers finish a job in 120 days. How many days for 150 equally efficient workers?
A 15 B 8 C 9 D 120
Answer: B) 8
111. 3 workers finish a job in 40 days. How many days for 12 equally efficient workers?
A 10 B 4 C 11 D 40
Answer: A) 10
112. 3 workers finish a job in 98 days. How many days for 42 equally efficient workers?
A 8 B 7 C 14 D 98
Answer: B) 7
113. 8 workers finish a job in 16 days. How many days for 16 equally efficient workers?
A 2 B 16 C 9 D 8
Answer: D) 8
114. 23 workers finish a job in 110 days. How many days for 253 equally efficient workers?
A 110 B 10 C 11 D 9
Answer: B) 10
115. 14 workers finish a job in 102 days. How many days for 238 equally efficient workers?
A 102 B 6 C 17 D 7
Answer: B) 6
116. 17 workers finish a job in 33 days. How many days for 187 equally efficient workers?
A 11 B 33 C 4 D 3
Answer: D) 3
117. 21 workers finish a job in 12 days. How many days for 84 equally efficient workers?
A 2 B 4 C 12 D 3
Answer: D) 3
118. 13 workers finish a job in 121 days. How many days for 143 equally efficient workers?
A 11 B 12 C 10 D 121
Answer: A) 11
119. 12 workers finish a job in 121 days. How many days for 132 equally efficient workers?
A 11 B 10 C 121 D 12
Answer: A) 11
120. 5 workers finish a job in 70 days. How many days for 70 equally efficient workers?
A 14 B 6 C 5 D 70
Answer: C) 5
121. A crew works 17 hours daily for 16 days. How many days at 34 hours daily for the same work?
A 9 B 8 C 32 D 16
Answer: B) 8
122. A crew works 8 hours daily for 28 days. How many days at 16 hours daily for the same work?
A 28 B 15 C 56 D 14
Answer: D) 14
123. A crew works 6 hours daily for 12 days. How many days at 12 hours daily for the same work?
A 6 B 12 C 24 D 7
Answer: A) 6
124. A crew works 10 hours daily for 12 days. How many days at 20 hours daily for the same work?
A 24 B 12 C 7 D 6
Answer: D) 6
125. A crew works 12 hours daily for 16 days. How many days at 24 hours daily for the same work?
A 16 B 32 C 8 D 9
Answer: C) 8
126. A crew works 4 hours daily for 18 days. How many days at 8 hours daily for the same work?
A 10 B 36 C 18 D 9
Answer: D) 9
127. A crew works 7 hours daily for 30 days. How many days at 14 hours daily for the same work?
A 16 B 15 C 30 D 60
Answer: B) 15
128. A crew works 10 hours daily for 16 days. How many days at 20 hours daily for the same work?
A 16 B 8 C 9 D 32
Answer: B) 8
129. A crew works 7 hours daily for 14 days. How many days at 14 hours daily for the same work?
A 14 B 28 C 8 D 7
Answer: D) 7
130. A crew works 7 hours daily for 20 days. How many days at 14 hours daily for the same work?
A 10 B 40 C 20 D 11
Answer: A) 10
131. A crew works 6 hours daily for 18 days. How many days at 12 hours daily for the same work?
A 36 B 10 C 9 D 18
Answer: C) 9
132. A crew works 7 hours daily for 8 days. How many days at 14 hours daily for the same work?
A 4 B 5 C 8 D 16
Answer: A) 4
133. A crew works 15 hours daily for 30 days. How many days at 30 hours daily for the same work?
A 16 B 60 C 30 D 15
Answer: D) 15
134. A crew works 9 hours daily for 22 days. How many days at 18 hours daily for the same work?
A 44 B 11 C 22 D 12
Answer: B) 11
135. A crew works 9 hours daily for 10 days. How many days at 18 hours daily for the same work?
A 6 B 5 C 20 D 10
Answer: B) 5
136. A crew works 12 hours daily for 8 days. How many days at 24 hours daily for the same work?
A 16 B 8 C 4 D 5
Answer: C) 4
137. A crew works 19 hours daily for 30 days. How many days at 38 hours daily for the same work?
A 16 B 30 C 60 D 15
Answer: D) 15
138. A crew works 17 hours daily for 26 days. How many days at 34 hours daily for the same work?
A 52 B 26 C 14 D 13
Answer: D) 13
139. A crew works 16 hours daily for 20 days. How many days at 32 hours daily for the same work?
A 40 B 11 C 20 D 10
Answer: D) 10
140. A crew works 11 hours daily for 30 days. How many days at 22 hours daily for the same work?
A 15 B 30 C 60 D 16
Answer: A) 15
141. Two pipes fill a tank in 32 and 18 hours separately. How many hours if both are opened?
A 289/25 B 18 C 288/25 D 32
Answer: C) 288/25
142. Two pipes fill a tank in 20 and 5 hours separately. How many hours if both are opened?
A 4 B 20 C 5 D 3
Answer: A) 4
143. Two pipes fill a tank in 22 and 13 hours separately. How many hours if both are opened?
A 41/5 B 286/35 C 13 D 22
Answer: B) 286/35
144. Two pipes fill a tank in 25 and 17 hours separately. How many hours if both are opened?
A 17 B 25 C 71/7 D 425/42
Answer: D) 425/42
145. Two pipes fill a tank in 6 and 17 hours separately. How many hours if both are opened?
A 102/23 B 103/23 C 6 D 17
Answer: A) 102/23
146. Two pipes fill a tank in 38 and 19 hours separately. How many hours if both are opened?
A 19 B 13 C 38 D 38/3
Answer: D) 38/3
147. Two pipes fill a tank in 31 and 12 hours separately. How many hours if both are opened?
A 12 B 372/43 C 373/43 D 31
Answer: B) 372/43
148. Two pipes fill a tank in 24 and 22 hours separately. How many hours if both are opened?
A 24 B 22 C 264/23 D 265/23
Answer: C) 264/23
149. Two pipes fill a tank in 39 and 27 hours separately. How many hours if both are opened?
A 16 B 351/22 C 39 D 27
Answer: B) 351/22
150. Two pipes fill a tank in 24 and 21 hours separately. How many hours if both are opened?
A 57/5 B 56/5 C 21 D 24
Answer: B) 56/5
151. Two pipes fill a tank in 14 and 21 hours separately. How many hours if both are opened?
A 14 B 42/5 C 21 D 43/5
Answer: B) 42/5
152. Two pipes fill a tank in 27 and 26 hours separately. How many hours if both are opened?
A 702/53 B 26 C 27 D 703/53
Answer: A) 702/53
153. Two pipes fill a tank in 12 and 9 hours separately. How many hours if both are opened?
A 36/7 B 37/7 C 12 D 9
Answer: A) 36/7
154. Two pipes fill a tank in 23 and 20 hours separately. How many hours if both are opened?
A 20 B 23 C 461/43 D 460/43
Answer: D) 460/43
155. Two pipes fill a tank in 23 and 25 hours separately. How many hours if both are opened?
A 23 B 12 C 575/48 D 25
Answer: C) 575/48
156. Two pipes fill a tank in 20 and 18 hours separately. How many hours if both are opened?
A 181/19 B 18 C 180/19 D 20
Answer: C) 180/19
157. Two pipes fill a tank in 32 and 32 hours separately. How many hours if both are opened?
A 32 B 17 C 16 D 15
Answer: C) 16
158. Two pipes fill a tank in 39 and 29 hours separately. How many hours if both are opened?
A 29 B 283/17 C 39 D 1131/68
Answer: D) 1131/68
159. Two pipes fill a tank in 22 and 23 hours separately. How many hours if both are opened?
A 22 B 169/15 C 23 D 506/45
Answer: D) 506/45
160. Two pipes fill a tank in 24 and 16 hours separately. How many hours if both are opened?
A 24 B 48/5 C 16 D 49/5
Answer: B) 48/5
161. A pipe fills a tank in 3 hours; a drain empties it in 7 hours. How many hours to fill with both open?
A 7 B 4 C 21/4 D 3
Answer: C) 21/4
162. A pipe fills a tank in 15 hours; a drain empties it in 27 hours. How many hours to fill with both open?
A 135/4 B 15 C 12 D 27
Answer: A) 135/4
163. A pipe fills a tank in 12 hours; a drain empties it in 28 hours. How many hours to fill with both open?
A 21 B 28 C 16 D 12
Answer: A) 21
164. A pipe fills a tank in 13 hours; a drain empties it in 31 hours. How many hours to fill with both open?
A 403/18 B 18 C 31 D 13
Answer: A) 403/18
165. A pipe fills a tank in 4 hours; a drain empties it in 11 hours. How many hours to fill with both open?
A 44/7 B 4 C 11 D 7
Answer: A) 44/7
166. A pipe fills a tank in 8 hours; a drain empties it in 21 hours. How many hours to fill with both open?
A 21 B 13 C 168/13 D 8
Answer: C) 168/13
167. A pipe fills a tank in 17 hours; a drain empties it in 23 hours. How many hours to fill with both open?
A 391/6 B 23 C 6 D 17
Answer: A) 391/6
168. A pipe fills a tank in 12 hours; a drain empties it in 18 hours. How many hours to fill with both open?
A 36 B 18 C 6 D 12
Answer: A) 36
169. A pipe fills a tank in 20 hours; a drain empties it in 25 hours. How many hours to fill with both open?
A 25 B 5 C 100 D 20
Answer: C) 100
170. A pipe fills a tank in 14 hours; a drain empties it in 31 hours. How many hours to fill with both open?
A 14 B 17 C 31 D 434/17
Answer: D) 434/17
171. A pipe fills a tank in 6 hours; a drain empties it in 11 hours. How many hours to fill with both open?
A 5 B 66/5 C 11 D 6
Answer: B) 66/5
172. A pipe fills a tank in 20 hours; a drain empties it in 38 hours. How many hours to fill with both open?
A 20 B 38 C 380/9 D 18
Answer: C) 380/9
173. A pipe fills a tank in 20 hours; a drain empties it in 39 hours. How many hours to fill with both open?
A 39 B 19 C 20 D 780/19
Answer: D) 780/19
174. A pipe fills a tank in 23 hours; a drain empties it in 32 hours. How many hours to fill with both open?
A 9 B 736/9 C 32 D 23
Answer: B) 736/9
175. A pipe fills a tank in 11 hours; a drain empties it in 21 hours. How many hours to fill with both open?
A 10 B 21 C 11 D 231/10
Answer: D) 231/10
176. A pipe fills a tank in 8 hours; a drain empties it in 26 hours. How many hours to fill with both open?
A 104/9 B 18 C 26 D 8
Answer: A) 104/9
177. A pipe fills a tank in 6 hours; a drain empties it in 19 hours. How many hours to fill with both open?
A 13 B 6 C 19 D 114/13
Answer: D) 114/13
178. A pipe fills a tank in 6 hours; a drain empties it in 8 hours. How many hours to fill with both open?
A 6 B 2 C 8 D 24
Answer: D) 24
179. A pipe fills a tank in 16 hours; a drain empties it in 31 hours. How many hours to fill with both open?
A 16 B 31 C 15 D 496/15
Answer: D) 496/15
180. A pipe fills a tank in 5 hours; a drain empties it in 19 hours. How many hours to fill with both open?
A 14 B 5 C 95/14 D 19
Answer: C) 95/14
181. A worker makes 66 units in 6 hours. How many units in 15 hours at the same rate?
A 181 B 165 C 90 D 66
Answer: B) 165
182. A worker makes 48 units in 6 hours. How many units in 5 hours at the same rate?
A 40 B 48 C 44 D 30
Answer: A) 40
183. A worker makes 240 units in 12 hours. How many units in 11 hours at the same rate?
A 220 B 242 C 132 D 240
Answer: A) 220
184. A worker makes 80 units in 5 hours. How many units in 14 hours at the same rate?
A 80 B 246 C 70 D 224
Answer: D) 224
185. A worker makes 120 units in 10 hours. How many units in 9 hours at the same rate?
A 118 B 108 C 90 D 120
Answer: B) 108
186. A worker makes 78 units in 6 hours. How many units in 3 hours at the same rate?
A 78 B 39 C 42 D 18
Answer: B) 39
187. A worker makes 187 units in 17 hours. How many units in 9 hours at the same rate?
A 108 B 187 C 153 D 99
Answer: D) 99
188. A worker makes 342 units in 18 hours. How many units in 5 hours at the same rate?
A 95 B 342 C 90 D 104
Answer: A) 95
189. A worker makes 108 units in 6 hours. How many units in 11 hours at the same rate?
A 66 B 198 C 217 D 108
Answer: B) 198
190. A worker makes 48 units in 16 hours. How many units in 6 hours at the same rate?
A 96 B 18 C 48 D 19
Answer: B) 18
191. A worker makes 128 units in 16 hours. How many units in 14 hours at the same rate?
A 224 B 128 C 123 D 112
Answer: D) 112
192. A worker makes 76 units in 4 hours. How many units in 12 hours at the same rate?
A 250 B 76 C 48 D 228
Answer: D) 228
193. A worker makes 80 units in 4 hours. How many units in 2 hours at the same rate?
A 44 B 40 C 80 D 8
Answer: B) 40
194. A worker makes 380 units in 19 hours. How many units in 14 hours at the same rate?
A 308 B 280 C 380 D 266
Answer: B) 280
195. A worker makes 240 units in 15 hours. How many units in 6 hours at the same rate?
A 105 B 240 C 90 D 96
Answer: D) 96
196. A worker makes 352 units in 16 hours. How many units in 4 hours at the same rate?
A 64 B 88 C 352 D 96
Answer: B) 88
197. A worker makes 280 units in 14 hours. How many units in 8 hours at the same rate?
A 280 B 176 C 112 D 160
Answer: D) 160
198. A worker makes 18 units in 3 hours. How many units in 13 hours at the same rate?
A 18 B 78 C 85 D 39
Answer: B) 78
199. A worker makes 32 units in 16 hours. How many units in 12 hours at the same rate?
A 24 B 32 C 192 D 26
Answer: A) 24
200. A worker makes 136 units in 8 hours. How many units in 4 hours at the same rate?
A 32 B 136 C 74 D 68
Answer: D) 68